Every site with its own costs

Bills of quantities, purchasing, subcontractors, labour and machine hours and progress billing are kept in one place. Management sees where a project stands while there is still time to act.

Construction

Site Bili Brig

Residential building, 24 flats

  1. Bill of quantities and quote412 cost items, quote sent
  2. ContractContract €2.4M, 18 months
  3. PurchasingConcrete and rebar ordered
  4. SiteSite log: 11 workers, slab pour
  5. SubcontractorsFacade crew, 60% of contract done
  6. Costs38% of budget spent
  7. Progress billingProgress claim 6 sent to supervisor
  8. HandoverHandover and final account

Where it gets stuck

Each of these problems is the same thing: data doesn’t get from one place to the other, so someone carries it by hand.

  • Connection brokenProject cost visible every week

    Project cost shows up at the end

    Materials, labour, machines and subcontractors are booked in different places. What a site really cost is known only after the final account.

  • Connection brokenHours entered by phone on site

    Hours are collected on paper

    At the end of the week site managers send in lists of workers and machines. Some of it is retyped, some reconstructed from memory.

  • Connection brokenBill built from the site log and cost items

    Progress bills are built by hand

    Completed quantities are checked against the bill of quantities in spreadsheets. Interim bills run late and deviations from the contract are found too late.

  • Connection brokenSubcontractors log work in the same project

    Subcontractors sit outside the system

    Subcontractor contracts, completed works and their bills live in e-mail and binders. It is hard to say how much has been paid and how much is still owed.

What the flow looks like in the system

An example flow. We adapt the steps to how your company actually works.

  1. 01 Bill of quantities and quote

    The bill of quantities is imported or built in the system with unit rates and labour standards. It becomes the quote and later the project budget.

  2. 02 Contract

    The signed contract turns the quote into a project with deadlines, items and agreed amounts. Variations and extra works are kept under the same project.

  3. 03 Purchasing

    Materials and equipment hire are tied to the site and the bill item. You see what was ordered, delivered and paid.

  4. 04 Site

    The site manager keeps the site diary, labour and machine hours and photos on a phone. Data arrives the same day, not at month-end.

  5. 05 Subcontractors

    Subcontractor contracts, their completed quantities and bills are tracked against the project. You know what has been paid and what remains.

  6. 06 Costs

    Every cost is grouped by site and bill item. Planned and actual can be compared at any time.

  7. 07 Progress billing

    Interim and final bills are built from completed quantities. Deviations from the bill of quantities are visible before anything goes to the client.

  8. 08 Handover

    The final account, handover and documentation close the project. Actual costs remain as a basis for the next quote.

What the system usually includes

Every module works with the same data. It plugs into the system instead of living as a separate program.

  • Bill of quantities and project budget

    The bill of quantities as the basis for the quote, contract and cost tracking. Every cost knows which item it belongs to.

  • Site diary on a phone

    Site diary, labour and machine hours, photos and notes. Entered on a phone, on site.

  • Subcontractors and purchasing

    Contracts, orders, completed works and payments per subcontractor and supplier.

  • Progress billing and final account

    Interim and final bills from completed quantities, with deviations from the contract in view.

Frequently asked questions

We run several sites at once. How are costs kept apart?

Every entry, from labour hours to supplier invoices, is tied to a site and, where needed, a bill item. The per-project overview then builds itself, with no manual sorting.

Will our site managers actually use the system on a phone?

Only if it saves them time. That’s why we keep the phone screens short and first walk through how site managers keep the diary and hours today, before drawing a single screen.

Can we keep preparing bills of quantities in our own spreadsheets?

Yes. The system can import a bill of quantities from the spreadsheet you already use. What changes is not how you prepare it, but what happens to it after the contract is signed.

Show us how you track a single site today.

Send us a short description of your process and the problems you want to solve.